Annex D
(informative)
Degree of obligation of the specifications
The provisions are marked corresponding to their degree of obligation:
(REQ) requirement;
(REC) recommendation;
(PER) permission;
(POS) possibility;
(ST) statement.
1. Scope
1.1 – 1.6 Provisions |
2. Normative reference
List |
3. Terms, definitions and symbols
3.1.1 – 3.1.20 List |
3.2 List |
4. Information needed for the execution of the works
4.1 General
4.1.1 (REQ) |
4.1.2 (REQ) |
4.2 special features
4.2.1 (REQ) |
4.2.2 (REQ) |
4.2.3 (REQ) |
5 Geotechnical investigation
5.1 General
5.1.1 (REQ) |
5.1.2 (REQ) |
5.1.3 (REQ) |
5.1.4 (REQ) |
5.2 Special aspects of soil nailing
5.2.1 (REQ) |
5.2.2 (REQ) |
5.2.3 (REC) |
5.2.4 (REC) |
5.2.5 (REQ) |
6 Materials and products
6.1 General
6.1.1 (POS) |
6.1.2 (REQ) |
6.1.3 (REQ) |
6.1.4 (REQ) |
6.1.5 (REQ) |
6.1.6 (PER) |
6.2 Soil nails systems
6.2.1 General
PER |
6.2.2 Reinforcing element
6.2.2.1 General
6.2.2.1.1 (ST) |
6.2.2.1.2 (PER) |
6.2.2.1.3 (REQ) |
6.2.2.2 Metallic reinforcing element
6.2.2.2.1 (REQ) |
6.2.2.2.2 (REQ) |
6.2.2.2.3 (REC) |
6.2.2.2.4 (REQ) |
6.2.2.2.5 (REQ) |
6.2.2.2.6 (REQ) |
6.2.2.3 Non-metallic reinforcing element
6.2.2.3.1 (PER) |
6.2.2.3.2 (REQ) |
6.2.2.4 Joints and couplings
6.2.2.3.1 (POS) |
6.2.2.3.2 (REQ) |
6.2.3 Grout
6.2.3.1 (REQ) |
6.2.3.2 (REQ) |
6.2.3.3 (REC) |
6.2.3.4 (PER) |
6.2.3.5 (REC) |
6.2.3.6 (PER) |
6.2.3.7 (REC) |
6.2.4 Sheaths and ducts
(REQ) |
6.3 Facing systems
6.3.1 General
6.3.1.1 (REC) |
6.3.1.2 (REQ) |
6.3.1.3 (REQ) |
6.3.1.4 (REQ) |
6.3.1.5 (REQ) |
6.3.1.6 (REQ) |
6.3.1.6 (REC) |
6.3.2 Panels and blocks (normally precast)
6.3.2.1 (REC) |
6.3.2.2 (REQ) |
6.3.2.3 (REQ) |
6.3.3 Sprayed concrete and cast in place concrete
6.3.3.1 (REQ) |
6.3.3.2 (PER) |
6.3.3.3 (REQ) |
6.3.3.4 (REQ) |
6.3.4 Mesh
6.3.4.1 (REQ) |
6.3.4.2 (REQ) |
6.3.4.3 (REQ) |
6.3.4.4 (REQ) |
6.3.5 Other materials
6.3.5.1 (REQ) |
6.3.5.2 (REQ) |
6.4 Drainage systems
(REQ) |
NOTE |
7 Design consideration
7.1 General
7.1.1 (ST) |
7.1.2 (REC) |
7.1.3 (REQ) |
7.1.4 (REQ) |
7.1.5 (REQ) |
7.1.6 (PER) |
7.1.7 (REQ) |
7.1.8 (REC) |
7.1.9 (REC) |
7.2 Design output
7.2.1 (REC) |
7.2.2 (REC) |
7.2.3 (REQ) |
7.2.4 (REQ) |
7.2.5 (REQ) |
7.2.6 (REQ) |
7.3 Design amendments
7.3.1 (PER) |
7.3.2 (REQ) |
7.3.3 (REQ) |
8 Execution
8.1 General
8.1.1 (POS) |
8.1.2 (REQ) |
8.1.3 (POS) |
8.2 Preliminary work
(POS) |
8.3 Excavation / Face preparation
8.3.1 (REQ) |
8.3.2 (PER) |
8.3.3 (POS) |
8.3.4 (PER) |
8.3.5 (REC) |
8.3.6 (REC) |
8.3.7 (REC) |
8.3.8 (REQ) |
8.3.9 (REQ) |
8.3.10 (REQ) |
8.3.11 (PER) |
8.3.12 (REQ) |
8.3.13 (REQ) |
8.3.14 (REQ) |
8.3.15 (REC) |
8.4 Nail installation
8.4.1 General
8.4.1.1 (POS) |
8.4.1.2 (REQ) |
8.4.1.3 (REQ) |
8.4.1.4 (REQ) |
8.4.1.5 (REQ) |
8.4.1.6 (REQ) |
8.4.1.7 (REQ) |
8.4.1.8 (REQ) |
8.4.2 Driven installation methods
8.4.2.1 (PER) |
8.4.2.2 (REQ) |
8.4.3 Drilled installation methods
8.4.3.1 General
8.4.3.1.1 (POS) |
8.4.3.1.2 (REQ) |
8.4.3.1.3 (REQ) |
8.4.3.1.4 (PER) |
8.4.3.1.5 (REQ) |
8.4.3.2 Uncased drilling
8.4.3.2.1 (POS) |
8.4.3.2.2 (REC) |
8.4.3.2.3 (REC) |
8.4.3.2.4 (REC) |
8.4.3.3 Cased hole drilling and hollow auger drilling
8.4.3.3.1 (REC) |
8.4.3.3.2 (PER) |
8.4.3.3.3 (REC) |
8.4.3.3.4 (REQ) |
8.4.3.4 Self-drilled hollow bar soil nails
8.4.3.4.1 (ST) |
8.4.3.4.2 (REC) |
8.4.3.4.3 (REQ) |
8.4.3.4.4 (REC) |
8.4.3.4.5 (REQ) |
8.4.4 Grouting procedures
8.4.4.1 General
8.4.4.1.1 (PER) |
8.4.4.1.2 (PER) |
8.4.4.1.3 (PER) |
8.4.4.1.4 (REC) |
8.4.4.1.5 (REC) |
8.4.4.1.6 (REC) |
8.4.4.1.7 (PER) |
8.4.4.2 Gravity grouting
8.4.4.2.1 (ST) |
8.4.4.2.2 (REC) |
8.4.4.3 Pressure grouting
8.4.4.3.1 (POS) |
8.4.4.3.2 (POS) |
8.4.4.3.3 (PER) |
8.4.4.3.4 (REC) |
8.4.4.3.5 (PER) |
8.4.5 Other nail installation methods
8.4.5.1 (REQ) |
8.4.5.2 (REQ) |
8.5 Drainage system
8.5.1 General
8.5.1.1 (REQ) |
8.5.1.2 (REQ) |
8.5.1.3 (REC) |
8.5.1.4 (POS) |
8.5.1.5 (REQ) |
8.5.1.6 (REC) |
8.5.2 Surface drainage
8.5.2.1 (REQ) |
8.5.2.2 (REC) |
8.5.2.3 (REC) |
8.5.2.4 (REC) |
8.5.2.5 (POS) |
8.5.2.6 (REC) |
8.5.3 Facing drainage
8.5.3.1 (ST) |
8.5.3.2 (REC) |
8.5.3.3 (REQ) |
8.5.3.4 (REQ) |
8.5.4 Subsurface drainage
8.5.4.1 (REC) |
8.5.4.2 (REQ) |
8.5.4.3 (REQ) |
8.5.4.4 (REQ) |
8.5.4.5 (REQ) |
8.5.4.6 (REQ) |
8.5.5 De-watering
(REQ) |
8.6 Facing installation and connection with nail heads
8.6.1 Hard facing
8.6.1.1 (PER) |
8.6.1.2 (REQ) |
8.6.1.3 (PER) |
8.6.1.4 (PER) |
8.6.1.5 (REC) |
8.6.2 Flexible facing
8.6.2.1 (REQ) |
8.6.2.2 (REQ) |
8.6.2.3 (REC) |
8.6.3 Soft facing
8.6.3.1 (REQ) |
8.6.3.2 (REQ) |
8.6.3.3 (PER) |
8.6.3.4 (REQ) |
8.6.3.5 (REQ) |
8.6.3.6 (REC) |
8.6.3.7 (POS) |
8.6.3.8 (REC) |
8.6.4 No modification to existing surface
8.6.4.1 (POS) |
8.6.4.2 (REQ) |
8.6.4.3 (REC) |
9 Supervision, testing and monitoring
9.1 General
9.1.1 (REQ) |
9.1.2 (REQ) |
9.1.3 (REQ) |
9.1.4 (REQ) |
9.2 Supervision
9.2.1 (REQ) |
9.2.2 (REQ) |
9.2.3 (POS) |
9.3 Testing
9.3.1 (POS) |
9.3.2 Soil nail load tests
9.3.2.1 (REC) |
9.3.2.2 (ST) |
9.3.2.3 (PER) |
9.3.2.4 (REC) |
9.3.2.5 (REQ) |
9.3.2.6 (REC) |
9.3.3 Material tests
9.3.3.1 (ST) |
9.3.3.2 (REQ) |
9.3.3.3 (REC) |
9.3.3.4 (REQ) |
9.3.3.5 (REQ) |
9.3.4 Face stability tests
9.3.4.1 (REC) |
9.3.4.2 (REC) |
9.3.4.3 (REC) |
9.4 Monitoring during construction
9.4.1 (REQ) |
9.4.2 (ST) |
9.4.3 (REC) |
9.4.4 (REQ) |
9.4.5 (REQ) |
9.4.4 (REC) |
9.5 Measures to facilitate long-term monitoring
9.5.1 (REC) |
9.5.2 (REQ) |
9.5.3 (PER) |
9.5.4 (REQ) |
9.5.5 (REQ) |
10 Records
10.1 (REQ) |
10.2 (REQ) |
10.3 (REQ) |
10.4 (REQ) |
10.5 (REC) |
10.6 (REQ) |
11 Special requirements
11.1 General
(REQ) |
11.2 Noise
11.2.1 (REQ) |
11.2.2 (REQ) |
11.2.3 (REC) |
11.2.4 (POS) |
11.3 Environmental damage
(REQ) |
Bibliography
[1] EN 445, Grout for prestressing tendons — Test methods
[2] EN 446, Grout for prestressing tendons — Grouting procedures
[3] EN 447, Grout for prestressing tendons — Basic requirements
[4] EN 14199, Execution of special geotechnical works — Micropiles
[5] EN 1990, Eurocode — Basis of structural design
[6] EN 1991 (all parts), Eurocode 1 — Actions on structures