Annex C (informative)

Bibliography

Recommended Practice Standard Procedure for Field Testing Water-Based Drilling Fluids, (reference: American Petroleum Institute Recommended Practice 13B-1, June 1, 1990).

Annex D (informative)

Degree of obligation of the provisions

The provisions are marked corresponding to their degree of obligation:

  • RQ: requirement;
  • RC: recommendation;
  • PE: permission;
  • PO: possibility and eventuality;
  • ST: statement.
1 Scope: ST 4th sentence: PO 1stpara:RQ
2 Normative references: ST 5th sentence: RQ 2nd para: RQ
3 Definitions 6.5 Concrete 3rd para: ST
3.1-3.11: ST 6.5.1 General 4th para: ST
4 Information required for the 1st para: RQ 5th para: ST
execution of the work 2nd para: RQ 6th para: RQ
1st para: RQ 6.5.2 Aggregates 7th para: RQ
2nd para: RQ 1st para: RQ 8th para: RQ
3rd para: PO 2nd para: RQ 9th para: RQ
4th para: PO 6.5.3 Cement 10th para: RQ
5 Site investigation 1st para: RQ 11th para: RQ
5.1 General: RQ 2nd para: PE 12th para: PO
5.2 Specific aspects: RQ 6.5.4 Water/cement ratio 13th para: PO
6 Materials 1st para: RC 7.3 Socketting into rock
6.1 General: RQ 2nd para: RC 1st para: RQ
6.2 Constituents 6.5.5 Admixture: PE 2nd para: PO
1st para: ST 6.5.6 Fresh concrete 7.4 Reinforcement cages
2nd para: ST 1st sentence: RQ 7.4.1 General
3rd para: RQ 2nd sentence: RC 1st para: ST
4th para: RQ 3rd sentence: PO 2nd para: PO
5th para: RQ 4th sentence: RQ 3rd para: RQ
6.3 Supporting fluids 5th sentence: RC 4th para: RQ
6.3.1 Bentonite suspensions 6.6 Plastic concrete or plastic mortar 5th para: RQ
1st para: RQ 1st para: ST 6th para: RQ
2nd para: PO 2nd para, 1st sentence: ST 7th para: PE
3rd para: PO 2nd para, 2nd sentence: RQ 7.4.2 Vertical reinforcement
4th para: RQ 3rd para: PO 1st para: RQ
5th para: PE 6.7 Steel: RQ 2nd para, 1st sentence: RQ
6th para: PE 7 Design considerations 2nd para, 2nd sentence: PE
7th para: RQ 7.1 General 3rd sentence: RQ
8th para: PO 1st para: ST 7.4.3 Horizontal reinforcement
9th para: PO 2nd para: RQ 1st para: RQ
10th para: PO 3rd para: RC 2nd para, 1st sentence: RQ
11th para: PO 4th para, 1st sentence: RQ 2nd para, 2nd sentence: PE
Note: ST 4th para, 2nd sentence: PE 3rd para, 1st sentence: RQ
6.3.2 Polymer solutions: PO 5th para, 1st sentence: RQ 3nd para, 2nd sentence: RC
6.3 Self-hardening slurries 5th para, 2nd sentence: PE 7.4.4 Multiple cages and joints
1st sentence: ST 6th para: RQ 1st para: RQ
2nd sentence: ST 7th para: PO 2nd para, 1st sentence: RQ
3rd sentence: RQ 7.2 Panel stability during excavation 2nd para, 2nd sentence: RQ
2nd para, 3rd sentence: PO 8.7 Placing the reinforcement or  
7.5 Recesses and perforations other elements: RQ  
1st para: RQ 8.8 Concreting and trimming  
2nd para: RQ 2nd para: RQ  
3rd para: RQ 3rd para: RQ  
4th para: RC 1st para, 1st sentence: RQ  
5th para: RC 1st para, 2nd sentence: PE  
7.6 Concrete cover 1st para, 3rd sentence: RQ  
1st para: ST 2nd para, 1st sentence: RQ  
2nd para: RQ 2nd para, 2nd sentence: PO  
3rd para: PE 3rd para: RQ  
4th para: RQ 4th para: RQ  
5th para, 1st sentence: PO 5th para: RC  
5th para, 2nd sentence: RQ 6th para: RC  
6th para: RQ 7th para: RQ  
8 Execution 8th para: RQ  
8.1 General: ST 9th para: RQ  
8.2 Tolerances 10th para, 1st sentence: RQ  
8.2.1 Panel excavation 10th para, 2nd sentence: RC  
1st para: RQ 10th para, 3rd sentence: RC  
2nd para: RQ 11th para: RC  
3rd para: PE 12th para: PE  
4th para: RQ 13th para: RQ  
5th para: PE 14th para: PO  
6th para, 1st sentence: RQ 15th para, 1st sentence: RQ  
6th para, 2nd sentence: ST 15th para, 2nd sentence: PO  
7th para: RC 16th para, 1st sentence: RQ  
8th para: RQ 16th para, 2nd sentence: RQ  
8.2.2 Reinforcement cage RQ 16th para, 3rd sentence: PE  
8.3 Preliminary works 9 Supervision of execution and  
8.3.1 Working platform monitoring  
1st para: RQ 1st para: RQ  
2nd para: RC 2nd para: RQ  
3rd para: RQ 3rd para: ST  
4th para: RQ 4th para: RQ  
5th para: RQ 5th para: RQ  
8.3.2 Guide-walls 6th para: ST  
1st para: ST 10 Site records  
2nd para: PE 1st para: RQ  
3rd para: RC 2nd para: PO  
4th para: RQ 11 Special requirements  
5th para: RC 1st para: RQ  
6th para: RC 2nd para: RQ  
7th para: RC 3rd para: ST  
8.4 Excavating    
8.4.1 Supporting the sides of the    
excavation    
1st para: ST Annex A (informative)  
2nd para, 1st sentence: PE Annex B (informative)  
2nd para, 2nd sentence: RC Annex C (informative)  
3rd para: RQ    
8.4.2 Excavating sequence    
1st para: ST    
2nd para: RQ    
3rd para: RQ    
8.4.3 Loss of supporting fluid RQ    
8.5 Cleaning the excavation RQ    
8.6 Forming the joints    
1st para: ST    

EN 1538:2000 Execution of special geotechnical works — Diaphragm walls