5.4

Processes (03 35xxx)

03   35001
blow out
sudden major escape of compressed air (BS EN 12110) from a tunnel (01) or caisson (01), often accompanied by an inrush of soil (01) and water
03   35002
blow down
reduce air pressure in a compressed air caisson (03 46024) to overcome resistance to sinking
5.5

Plant, equipment and documentation (03 36xxx)

03   36001
crib
temporary frame (01) or layers of horizontal members that transfer a vertical load (01) from one structural member (01) from one level to another
03   36002
allowable pile load
load (01) from one structural member (01) that may be applied to a pile (01), taking account of its ultimate bearing capacity (03 27036), negative skin friction (03 36008), pile (01) spacing, overall bearing capacity of the ground (01) below, allowable settlement (01) and appropriate factor of safety (01)
03   36003
pile design load
load (01) from one structural member (01) that a pile (01) is designed to carry
03   36004
pile working load
load (01) from one structural member (01) that a pile (01) carries in service
03   36005
pile proof load
load (01) from one structural member (01) greater than the pile design load (03 36003) applied to a selected pile (01) to confirm its suitability
03   36006
shaft adhesion
supportive adhesion (01) by which a pile (01) shaft transfers load (01) from one structural member (01) into surrounding soil (01) or fill (01)
03   36007
skin friction
support given by the combined effect of shaft friction (03 37003) and shaft adhesion (03 36006)
cf. skin friction (03 27019)
03   36008
negative skin friction
downdrag
downward pressure, exerted by a combination of frictional forces (01) and adhesion (01) on a pile (01) by surrounding soil (01) or fill (01), when the soil (01) or fill (01) settles relative to the pile (01) shaft
03   36009
decompression tables
schedules (10 26009) of pressure changes with time, which govern the return to atmospheric pressure of persons subjected to a higher pressure
03   36010
single acting hammer
impact hammer (BS EN 12699) that uses internal power to raise the pile ram (03 36018) and is then allowed to fall
03   36011
double acting hammer
impact hammer (BS EN 12699) that uses internal power to raise the pile ram (03 36018) and to increase the downward force (01)
03   36012
drop hammer
impact hammer (BS EN 12699) raised by a winch (12 36023) and allowed to fall
NOTE Usually a metal weight.
03   36014
pile frame
movable structure (01) for installing driven piles (BS EN 12699) with an impact hammer (BS EN 12699) in the correct position and alignment
03   36015
driving cap
cap placed temporarily on top of a steel pile (03 32017) to distribute the blow (03 34005) over the cross-section and to minimize damage to the pile head (BS EN 12699) during driving (BS EN 12699)
03   36016
drilling bucket
boring tool in the form of a cylindrical container, at the bottom of a kelly bar (03 36017) that incorporates cutting teeth or blades and has corresponding openings in its base plate (01)
03   36017
kelly bar
sliding shaft on a drilling rig (12 26045) that transmits the driving force (01) or torque to the drill (12 16005) from a driven rotary table
03   36018
pile ram
rising and falling part of an impact hammer (BS EN 12699)
03   36019
air deck
airtight platform (06 52012) in a caisson (01) or shaft (01) for compressed air work (03 34006)
5.6

Properties (03 37xxx)

03   37001
net loading intensity
decrease or increase in intensity of vertical loading at the base of a foundation (01) due to excavation (01) or the weight (11 27002) of a new structure (01) including earthworks (01)
cf. net loading intensity (03 27037)
03   37002
bulb of pressure
mass (11 27001) of soil (01) around and beneath a pile (01) or group of piles (01) that is subjected to stress (01) by the applied loading
cf. bulb of pressure (03 27043)
03   37003
shaft friction
supportive friction by which a pile (01) shaft transfers load (01) from one structural member (01) into surrounding soil (01) or fill (01)
03   37004
drop
stroke
distance which a drop hammer (03 36012) or pile ram (03 36018) falls
5.7

Miscellaneous (03 39xxx)

03   39001
decompression illness
illness that may be suffered by people who are subjected to a too rapid reduction in air pressure after they have been doing compressed air work (03 34006)
03   39002
pain only decompression illness
bends
decompression illness (03 39001) caused by the formation of nitrogen bubbles in limb joints
NOTE Manifested by pain in one or more of limb joints.
03   39003
serious decompression illness
decompression illness (03 39001) affecting cardiovascular,
neurological, respiratory or gastro-intestinal systems
6 Tunnels, shafts and caissons (03 4xxxx)